Project Overview
Undertook the Environmental and Social Impact Assessment (ESIA) Scoping Study and Resettlement Action Plan (RAP) framework development for the proposed 451 km Nairobi–Mombasa Expressway (NME), a nationally significant transport infrastructure corridor aimed at improving regional connectivity, freight efficiency, and road safety along Kenya’s primary economic artery.
Given the linear and trans-regional nature of the project, the assignment required a corridor-scale environmental and social risk scoping process across highly diverse ecological zones, land-use systems, and settlement patterns.
Our Approach
We developed a comprehensive ESIA Scoping Study and Terms of Reference (ToR) to define the full scope and methodology for subsequent detailed ESIA and RAP preparation.
The assignment was aligned with:
- IFC Performance Standards on Environmental and Social Sustainability
- World Bank Environmental and Social Framework (ESF)
- Kenyan regulatory requirements under NEMA
The approach established a structured foundation for assessing environmental, biodiversity, and social risks across all project phases.
Key Components of Work Delivered
1. Environmental and Social Scoping & Corridor Risk Mapping
- Conducted detailed corridor-wide screening to identify environmental and social sensitivity hotspots
- Mapped land-use patterns, settlement clusters, protected areas, water crossings, and ecologically sensitive zones
- Identified cumulative and induced impacts associated with long linear infrastructure development
2. Wildlife Connectivity Modelling & Ecological Fragmentation Assessment
- Undertook wildlife connectivity modelling to assess habitat fragmentation risks along the proposed corridor
- Identified ecological corridors, wildlife movement pathways, and barrier effects of highway infrastructure
- Assessed impacts on habitat continuity and landscape permeability in biodiversity-sensitive areas
- Informed mitigation planning including wildlife crossings, underpasses/overpasses, and corridor alignment options
- Supported alignment with IFC Performance Standard 6 (Biodiversity Conservation and Sustainable Management of Living Natural Resources)
3. Stakeholder Engagement & Institutional Mapping
- Conducted early-stage stakeholder identification across national, county, and community levels
- Mapped regulatory, infrastructure, conservation, and community stakeholders along the corridor
- Captured preliminary concerns related to land acquisition, displacement, ecological disruption, and livelihood impacts
4. Baseline Study Framework Development
- Physical environment (air quality, noise, hydrology, geology)
- Biological environment (flora, fauna, ecosystems, critical habitats)
- Socio-economic environment (livelihoods, land tenure, community services)
- Transport and land-use dynamics along the corridor
5. Terms of Reference (ToR) for ESIA & RAP Development
- Full ESIA preparation across the 451 km corridor
- Development of a Resettlement Action Plan (RAP) in line with IFC Performance Standard 5
- Specialist studies including biodiversity, wildlife movement, hydrology, air quality, noise, cultural heritage, and traffic impacts
- Development of Environmental and Social Management Plans (ESMPs)
- Grievance redress mechanisms and stakeholder engagement frameworks
6. Resettlement Planning Framework (Pre-ESIA Stage)
- Identified early-stage land acquisition and displacement risk zones
- Defined principles for compensation, livelihood restoration, and vulnerable group considerations
- Established RAP structure aligned with international lender expectations
Impact & Value Delivered
- Delivered a comprehensive ESIA Scoping Study and Terms of Reference (ToR) for the expressway
- Integrated wildlife connectivity modelling into early-stage planning for biodiversity-sensitive design
- Identified key ecological and social sensitivity hotspots along the 451 km corridor
- Established compliance pathway for NEMA approval and international investor due diligence
- Informed stakeholder engagement strategy and prioritisation of high-risk corridor segments
- Provided a robust foundation for full ESIA and RAP development in line with IFC and World Bank standards
- Positioned the project for environmentally and socially responsible infrastructure planning at national scale